Lao PDR Southeast Asia Disaster Risk Management Project

Location : Oudomxay Province
Consultant Cost: USD 1,401,412.56
Construction Cost: USD 3,729,907.62
Funded by: World Bank (IDA Credit NO.6120-LA)
Consultant: ISAN Corporation and LTEC as Sub Consultant
Lead Firm: ISAN
Client: MPWT

Construction Supervision for Nam kor Bank Protection the main work is include Bank Protection Leangth: 1,320 Km Reverside Park (A : 1.2 ha), Road elevation ( L :0-95 Km), Road work L: 950m (Double surface dressing), Total manmonth: 187 mm. Period 45 months, Form 8/ 2021 - 11/2022